A Pool can be Filled in 4 Hours and Drained in 5 Hours GMAT Problem Solving

Overview es 2Overview en 2RegistrationExam PatternPreparation TipsPractice PaperResultCut offmock testNews
Sayantani Barman's profile photo

Sayantani Barman

Experta en el extranjero | Updated On - Dec 27, 2022

Question: A pool can be filled in 4 hours and drained in 5 hours. The valve that fills the pool was opened at 1:00 PM and sometime late the drain that empties the pool was also opened. If the pool was filled by 11:00 PM and not earlier, when was the drain opened?

  1. At 2:00 PM
  2. At 2:30 PM
  3. At 3:00 PM
  4. At 3:30 pm
  5. At 4:00 PM

Correct Answer: (D)

Solutions and Explanation

Approach Solution (1):

When only the valve is open, the pool is filling at a rate of \(\frac{1}{4}\) an hour. When both the valve and the drain is open, the pool is filling at a rate of \(\frac{1}{4}-\frac{1}{5}=\frac{1}{20}\) an hour. Let x denote the time when only the valve was open. Then both the valve and the drain were open for 11 – 1 – x = 10 – x hours.

Now we can compose the equation: \(\frac{1}{4}x+\frac{1}{20}(10-x)=1\) which reduces to \(\frac{x}{5}=0.5\) from where x = 2.5.

Thus, the drain was opened at 1:00 + 2:30 = 3:30 PM

Approach Solution (2):

The valve that fills is working at a e=rate of ¼ per hour

The drain is working at a rate of 1/5 per hour

Not the valve is open for 10 hours (between 1 PM to 11 PM)

Let the drain be open for x hours

So work done is 10/4 (valve’s work)

Drain work is x/5

10/4 – x/5 = 1 (assuming work is 1)

Gives us x = 7.5 hours

Drain was open for 7.5 hours which is 2.5 hours from 1 PM = 3:30 PM

Approach Solution (3) :

Consider the overall work = 100%.

Each hour's output for filling A is 25% (Work completed in 1 hour is 25% of the total 4 hours of work.)

Work by Drain (B) = –20% (negative because it goes against the flow of the tank filling naturally; 20% is found as before).

Consider the filling time as x, then the combined time of A and B is, 10 - x

Work is now evaluated as time multiplied by a rate.

Which implies, 100% = 25*x + (25-20=5) *(10-x) (10-x)

x=2.5 hours after solving

As a result, the drain was opened 2.5 hours after A. As a result, the drain was opened at 1:30 +2.5 hrs =3:30 p.m.

“A pool can be filled in 4 hours and drained in 5 hours. The valve that fills the pool was opened at 1:00 PM and sometime late the drain that empties the pool was also opened. If the pool was filled by 11:00 PM and not earlier, when was the drain opened?”- is a topic of the GMAT Quantitative reasoning section of GMAT. This question has been taken from the book “GMAT Official Guide Quantitative Review”. To solve GMAT Problem Solving questions a student must have knowledge about a good amount of qualitative skills. The GMAT Quant topic in the problem-solving part requires calculative mathematical problems that should be solved with proper mathematical knowledge.

Suggested GMAT Problem Solving Samples

*The article might have information for the previous academic years, please refer the official website of the exam.

Ask your question

Subscribe To Our News Letter

Get Latest Notification Of Colleges, Exams and News

© 2024 Zollege Internet Private Limited